- Ensure the Rock is fully charged before installation by using the included Mini-USB charger. (Fully charged from 0% in 30 hrs)
- Navigate to https://scs.syscom-instruments.com/ to see to configure your ROCK
- Enter in your SCS account;
- Create a New Project, under section PROJECTS
- Access the POOL section and TAKE IN the ROCK in your account
- ASSIGN the ROCK to the project
- Turn ON the Rock and select the duration
- Set the ROCK parameters(trigger, alarms,.etc)
- Set reporting and notifications, if needed.
- Install the Rock on a horizontal surface. The mounting location should be relatively flat and should not consist of loose materials like sod, soft ground coverings, or debris.
- Attach the antenna to the top of the Rock.
- Use the three leveling screws on the mounting plate to ensure the bubble level on the top of the Rock is within the circle.
(Pro-tip: use the surveyor's Left Thumb Rule to level the screws quickly and efficiently)
Figure 5. Left Thumb Rule Leveling - Push the power button for 1 second to turn the Rock on. It will automatically attempt to connect to the cloud. See the below status indicator LEDs.
- Navigate to https://scs.syscom-instruments.com/ to see the latest data and check the status of your Rock.